Office Complex
Munich Westend

All projects
  • Awarded: Nominee Flachdach Contest 2023
  • Certified: KfW 55, DGNB Gold aspired
  • Year: since 2022
  • Category: Revitalization, Interior Design
  • Use: Office
  • State: In Planning
  • Construction: Massive
  • More details
    Scope
    LP 1–8  

    Location
    Ganghoferstr. 29
    München

    Gross Floor Area
    ca. 29.100m²

    Client
    Wealthcap Kapitalverwaltungsgesellschaft mb

The large office complex in Munich's Westend district is being adapted to new usage concepts and modernized in terms of energy efficiency. The extensive interventions in the building structure will turn the existing building into a prototype for revitalization. In future, it will fulfill eminently important sustainability criteria and ESG guidelines.

Revitalization Concept

In order to connect the building ensemble to the public space, the external areas will be unsealed and linked to the surrounding area. The first floor will be used for a public café and accessed via two additional entrance areas. The newly created access routes also allow the office space to be restructured. Flexibly configurable workstations are being created under the 'New Ganghofer' label.

Activation of Roof Areas

The 6,100 m² of roof space located on various levels also play an important role in the revitalization concept. To date, the existing flat roof area has been largely unused and only parts of it have been used for technical structures.

In order to achieve an improved microclimate on site and thus support biodiversity in the city, the integration of water retention areas was planned.

By creating barrier-free access cores, the roof areas will be activated and designed as accessible and green outdoor terraces. This will create attractive recreational areas for employees with panoramic views as far as the Alps.